Industry pack
Renewable Energy
WHS workflows.
Solar, wind, and battery storage — working at heights, electrical isolation, and DC safety. Pre-configured permits, AI-generated SWMS, and sign-on rosters — ready from day one.
Permits auto-generated
- Electrical Isolation (DC & AC)
- Working at Heights
- Hot Work
- Traffic / Public Safety
SWMS covered
- Solar panel installation (rooftop)
- Battery energy storage system (BESS) commissioning
- Wind turbine blade inspection
- Inverter replacement and testing
- Cable trenching and underground conduit
Key risks managed
- DC shock hazard (solar arrays can't be fully de-energised)
- Falls from rooftops and turbine towers
- Arc flash during battery storage work
- Manual handling of heavy panels
- Heat stress during rooftop installation
Regulations covered
- AS/NZS 5033 (Installation of PV arrays)
- AS/NZS 3000:2018 (Wiring rules)
- AS/NZS 4777 (Grid connection of inverter energy systems)
- WHS Regulation 2017
- Clean Energy Council installation guidelines