Industry pack

Demolition
WHS workflows.

Asbestos management, structural stability, exclusion zones — demolition-specific SWMS packs. Pre-configured permits, AI-generated SWMS, and sign-on rosters — ready from day one.

Permits auto-generated

  • Demolition Work Permit
  • Asbestos Removal (Class A or B)
  • Traffic / Public Safety
  • Working at Heights
  • Electrical Isolation

SWMS covered

  • Structural demolition (mechanical)
  • Asbestos identification and removal
  • Façade stripping and cladding removal
  • Hazardous material decontamination
  • Temporary structural support installation

Key risks managed

  • Unplanned structural collapse
  • Asbestos fibre exposure
  • Falling debris onto workers / public
  • Striking concealed services (gas, electrical)
  • Dust and silica inhalation

Regulations covered

  • WHS Regulation 2017 — Part 8.1 (Demolition work)
  • How to Safely Remove Asbestos CoP
  • AS 2601 (Demolition of structures)
  • Asbestos Safety and Eradication Agency guidelines
  • AS 1940 (Flammable and combustible liquids)